| HP0-Y15 Exam |
| HP0-Y15 - Exam Information |
| Question of the day |
You have successfully completed the deployment of a ProCurve NAC 800 perating with the 802.1X quarantine method along with a ProCurve 3500yl switch and a Microsoft IAS server. The next stage of the deployment plan involves integrating IDM with the Endpoint Integrity solution. You have installed PCM+ with IDM on another server in the network. Which additional tasks must be performed? (Select two.)
Answer(s)
The IDM Agent for Windows must be installed on the IAS server.
The switch's IP address must be specified in the SAIASConnector.ini file on the IAS server.