E20-820  Exam

Exam # of questions Description  Update
E20-820 88 E20-820... 02/15/2011
[Practice Test]    [Download Study Guide(PDF)]   [Update Exam]

E20-820 - Exam Information
  • Description: CLARiiON Solutions Expert Exam for Technology Architects
  • Passing Score: 75%
  • Practice Test - Number of questions: 88 questions
  • Simulation Test - Number of questions: 88 questions
  • Simulation Test Duration: 90 minutes
  • Has explanations: No

Question of the day

Answer(s)

  1. Corp wants to implement a local backup and recovery solution for an Exchange 2003 two-node active/passive MSCS using RM-SE on a CX700. The cluster has four LUNs.There are two Exchange Storage Groups, each one a dedicated LUN and each has a dedicatedLog LUN.ABC wants to schedule these jobs to run twice daily and the replicas need to be verified asconsistent.Which configuration will meet these requirements?A. Create two RM-SE replica jobs and use a mount host outside the cluster to both schedule andverify the replicas prior to backup
  2. Create one RM-SE replica job and use the passive node of the cluster to both schedule the joband verify the replica prior to backup
  3. Create two RM-SE replica jobs and use the passive node to schedule the jobs and a mounthost outside the cluster to verify the replicas prior to backup
  4. Create four RM-SE replica jobs and use the passive node to schedule the jobs and a mounthost outside the cluster to verify the replicas prior to backup
Correct Answer

Corp wants to implement a local backup and recovery solution for an Exchange 2003 two-node active/passive MSCS using RM-SE on a CX700. The cluster has four LUNs.There are two Exchange Storage Groups, each one a dedicated LUN and each has a dedicatedLog LUN.ABC wants to schedule these jobs to run twice daily and the replicas need to be verified asconsistent.Which configuration will meet these requirements?A. Create two RM-SE replica jobs and use a mount host outside the cluster to both schedule andverify the replicas prior to backup