- customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS1000E Rls. 5.0. A Media Gateway Controller (MGC) with DSP Daughterboard is being installed toreplace the SSC card in this configuration.Assume the following upgrade tasks have been completed:1) The MG 1000 chassis has been powered down.2) The SSC card has been removed from the MG 1000T.3) The CP-PM Call Server software has been loaded.4) The DSP Daughterboard and 128 mb CF have been installed.Which is the next sequential step in the upgrade process?A. Install the CP-PM Signaling Server card.
- Configure the Conference and TDS loops.
- Enter mgcsetup to configure IP parameters.
- Place the MGC card into slot zero and connect it to the network.
Correct Answer Place the MGC card into slot zero and connect it to the network.