Answer(s)
- customer is upgrading an existing Media Gateway 1000T Rls. 4.5 with an expansion to a standalone Communication Server (CS) 1000E Rls. 5.0 with two IP Media Gateways and a SignalingServer that is a Nortel ISP 1100. After the installation, which should you do to verify that there issufficient memory to support the upgrade to Rls. 5.0?A. View the attributes of the Signaling Server using Element Manager.
- Remove the cover from the ISP 1100 and look at the label(s) on the DIMM board(s).
- Boot the Signaling Server and monitor the startup messages for configured memory.
- Follow the procedure to verify successful memory upgrade and look for the message 1 GByteOK, since 1 GB of memory is required in the ISP 1100.
Correct Answer Follow the procedure to verify successful memory upgrade and look for the message 1 GByteOK, since 1 GB of memory is required in the ISP 1100.