Answer(s)
- customer plans to implement an MCS 5100 3.0 system and wants to ensure that the site hasthe necessary equipment to interconnect to their existing IP-based enterprise network. Whichrequirements must be provided before the system can be installed and connected to theenterprise network? (Choose two.)Exam Type NortelA. Two separate AC power sources
- Optional Uninterruptible Power Supplies
- Layer 1 switch with 1G Ethernet interfaces
- Layer 2 switch with 10/100M Ethernet interfaces
Correct Answer
Optional Uninterruptible Power Supplies
Layer 2 switch with 10/100M Ethernet interfaces